
Taichung Building 3
Case location: Houli, Taichung
Case site specifications: Building A 19.5kWp, Building B (19.5+80.19kWp), Building C (19.8+80.19kWp)
Solar panel: AUO
Annual power generation is approximately: Building A 25,907 kWh, Building B (25,907 kWh + 106,540 kWh) + Building C (26,306 kWh + 106,540 kWh)
(Subject to differences in case conditions and climate)
Add to inquiry
Case site specifications: Building A 19.5kWp, Building B (19.5+80.19kWp), Building C (19.8+80.19kWp)
Solar panel: AUO
Annual power generation is approximately: Building A 25,907 kWh, Building B (25,907 kWh + 106,540 kWh) + Building C (26,306 kWh + 106,540 kWh)
(Subject to differences in case conditions and climate)